Produced Water (Layer Water) Treatment Projects
Project Details
PRE-FEED PHASE
SFW together with AFW Italiana carried out the following activities:
- Pre-FEED of the CDU/VDU revamping
- Preparation of the “as is” documentation for the “CDU/VDU” and UOS
- Supporting activities for topographic survey, oil investigation, initial NDT campaign, Laser Scanning, Logistics Study
FEED PHASE
FEED for the whole refinery has started in February 2016
The split of work between SFW and AFW Italiana was vertical
Scope of work:
Assesment of existing processes and UOS units
FEED of Merox, Amine Treatment (ATU) and Sour Water Stripper (SWS) Units
FEED of the most of UOS systems