DETAILED ENGINEERING FOR REVAMP UNITS

DETAILED ENGINEERING FOR REVAMP UNITS
DETAILED ENGINEERING FOR REVAMP UNITS

Project Details

DETAILED ENGINEERING FOR REVAMP UNITS:

NAPHTHA HYDROTREATMENT (NHT) UNIT

  • Capacity: 1191 M MTA

AMINE TREATMENT (ATU) UNIT

  • Capacity: 569.8 M MTA

STORAGE TANKS

  • UNITS 24/38/47

CAUSTIC / INSTRUMENT & PROCESS AIR

  • UNITS 61/66

INTERCONNECTING

  • External to Refinery
error: Alert: Content is protected !!